Exterior · Commercial
Roof coating
Auckland

- Location
- Auckland, Auckland
- Type
- Commercial
- Work
- Exterior
What the job involved
Roof work is mostly preparation. A roof that looks tired is usually sound underneath, but the surface has chalked, moss has taken hold in the laps, and rust around the fixings has started to lift the old coating.
So the roof gets a full wash-down first, moss and mould treated, and any rust taken back and treated before anything else happens. Only then does the coating go on.
Access and safety are worked out before we quote rather than after. On a two-storey roof that is most of what determines how long the job takes.
Before & after
The difference is in what you can’t see.
Drag the handle across. Most of the work on a repaint happens before the first coat goes on, and it is the reason the second one lasts.


Project photos
